OPERATIVE CYCLE OF THE PLANT:
The transformation phases of the electro-mechanical plant are identified in nine treatment and work areas:
 
1. S.U.R. unloading area.
2. S.U.R. extraction and trituration.
3. Closed cycle desiccation(drying between 100 and 130oC)
4. Separation, grinding and pulverization;
5. S.U.R. storage and dosage, polymer binder and inert additive (CaO or CaCO3)
6. Mixing and extrusion granules
7. Material production for building trade use;
8. Electric plant, control and command system
9. Auxiliary service.
 
FACILITY POTENTIALITY: The typical plant is normally dimensioned to transform about 250 daily/ton's of S.U.R. for 6 days a week, 24 hours a day. It's prepared that there's a stock of 500 ton's of S.U.R. for example a continuous production also on Sunday if necessary!
 